Skip to content
Back to search

Finland – Petroleum products, fuel, electricity and other sources of energy – Kokonniemen liikuntakeskus - Alueellisen energiatuotantojärjestelmän hankinta

Porvoon kaupunkiFinlandPublished on Oct 04, 2026
No deadline given

Description

The Kokonniemi sports park in Porvoo will be significantly expanded in 2027–2030. The area will feature a new ice hall with two rinks, a multi-purpose arena with ancillary spaces, and a new heated artificial turf pitch with associated buildings. The existing ice hall will be demolished, and the remaining buildings and the current heated artificial turf will remain. The client will procure an area-wide energy system on a service model: the supplier will design, invest in, build, own and operate the energy production and local low-temperature network, and deliver heat and cooling to the area's facilities at a service and energy price agreed for the contract period. The supplier's energy production system will fully cover the area's heating and cooling energy needs. The procurement aims to achieve:

- a high proportion of renewable and locally produced energy. The form of backup heating will be proposed by the bidder.

- the waste heat from the ice halls' refrigeration systems will be primarily utilised within the property. The supplier may utilise any surplus low-temperature heat, which will be specified during negotiations.

- predictable and competitive lifecycle costs for the client

- secure energy supply for the area as it is completed in stages

- compliance with the RTYL targets set for the project area

- a single responsible party for the production of heat and cooling for the area

The subject of the procurement is the construction of the energy system and the supply of heat energy to the client's facilities for the contract period:

- Ice hall (completion 2028)

- Aula and multi-purpose arena (completion 2030)

- Existing heated artificial turf pitch (heating starts autumn 2028)

OPTION: The overall area energy procurement includes an option for a new heated artificial turf pitch to be implemented on the southern side of the area, with a surface area of approximately 9,000 m², and an associated maintenance building with a size of approximately 400 m². If the client takes up the option, the supplier will commit to implementing the energy solution for the artificial turf pitch and maintenance building as part of the area-wide energy system. The supplier must consider the energy needs and connectivity of the option targets to the energy solution already in the tendering and measurement phase. The preliminary schedule for the option targets is as follows:

- Construction of the maintenance building will commence in 2027 and is scheduled to be taken into use in 2028.

- Construction of the heated artificial turf pitch will commence with pre-construction work in 2027. The target for the pitch to be taken into use is the start of the 2029 playing season.

The schedules are preliminary and will be refined as the project progresses. The service provider must be prepared to implement the energy solutions for the option targets according to the schedule outlined above. See the procurement documents for more details.

CPV codes

Petroleum products, fuel, electricity and other sources of energyElectricity, heating, solar and nuclear energyElectrical machinery, apparatus, equipment and consumables; lightingConstruction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders