Skip to content
Back to search

Netherlands – Architectural, construction, engineering and inspection services – Total engineer - Nieuwbouw Venlo

Fontys HogeschoolNetherlandsPublished on Jun 23, 2026
No deadline given

Description

The contract concerns the integral engineering, design development, advisory services, and technical coordination for the realisation of approximately 12,800 m² bvo new construction for Campus Venlo. The realisation will take place at the current location at Tegelseweg 255, as a replacement for the outdated building W1 and part of the campus site. After the completion of the new construction, building W1 will be demolished. Subsequently, part of the site will be arranged according to the new campus concept and parking will be realised at ground level. The redevelopment of building W3 and the directly surrounding site around W3 fall outside the scope of the new construction project. The task is to optimise and translate within the spatial, functional, and quality frameworks into a technically feasible, sustainable, and future-oriented design. In addition, the Total Engineer will act as an advisor to Fontys and will investigate, compare, and substantiate the different design variants. - The contract concerns the integral engineering, design development, advisory services, and technical coordination for the realisation of approximately 12,800 m² bvo new construction for Campus Venlo. - The designing parties are responsible for developing a flexible, future-proof, and (modular) building concept that accommodates approximately 2,750 students (with a range of 2,500-3,000 students) and 250 fte staff, arranged according to the Fontys broad Sticky Campus concept. - The contract concerns the execution of the design activities, in accordance with the scope and starting points described in this tender guidance. The Purchasing Authority does not set a task-based budget for the realisation in this phase. A task-based realisation budget will be set in the approval phase and will be part of the agreement. Based on the scope, starting points, and reference frameworks, an indicative estimate of the construction costs can be provided by the Purchasing Authority in the approval phase. The construction costs for the realisation of the project are estimated within a range. This range is intended as an orientative framework and can be further concretised and updated during the design phases. No rights can be derived from this indication.

CPV codes

Architectural, construction, engineering and inspection services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders