Skip to content
Back to search

Poland – Solar installation – Zaprojektowanie, dostawa i montaż instalacji paneli fotowoltaicznych w ramach realizacji projektu pn.: „Budowa instalacji paneli fotowoltaicznych dla budynków użyteczności publicznej w Gminie Aleksandrów Łódzki”

Gmina Aleksandrów ŁódzkiPolandPublished on Oct 22, 2026
16 days left

Description

1. The subject of the order is the design, supply and installation of photovoltaic panel systems as part of the implementation of the project entitled: „Construction of photovoltaic panel installations for public utility buildings in the Municipality of Aleksandrów Łódzki”. 2. The subject of the order will be implemented in the „design and build” formula and includes the execution and commissioning of photovoltaic installations along with energy storage systems in the following locations: 1) Town Hall in Aleksandrów Łódzki, Kościuszki Square 2 – PV installation kWp-45, min. energy storage (ME) capacity kWh-60, min. power of hybrid inverters (kW)-2x20kW(40kW), mounted on a supporting structure; 2) Town Hall in Aleksandrów Łódzki, Kościuszki Square 4 - PV installation kWp-20, min. energy storage (ME) capacity kWh-40, min. power of hybrid inverters (kW)-1x20kW(20kW), mounted on a supporting structure; 3) Primary School with Integration Departments named after Janusz Korczak in Ruda Bugaj, Ruda Bugaj 54 - PV installation kWp-49.5, min. energy storage (ME) capacity kWh-100, min. power of hybrid inverters (kW)-2x25kW(50kW), mounted on the roof of two buildings; 4) Primary School No. 4 named after Maria Skłodowska-Curie in Aleksandrów Łódzki, al. Wyzwolenia 3 - PV installation kWp-49.5, min. energy storage (ME) capacity kWh-100, min. power of hybrid inverters (kW)-2x25kW(50kW), mounted on the roof of the building; 5) Primary School named after Father Stefan Cardinal Wyszyński, Primate of the Millennium in Rąbienie, ul. Słowiańska 5 - PV installation kWp-30, min. energy storage (ME) capacity kWh-50, min. power of hybrid inverters (kW)-1x30kW(30kW), mounted on the roof of the building; 6) Municipal Swimming Pool Olimpijczyk in Aleksandrów Łódzki, ul. Bankowa 5 - PV installation kWp-97, min. energy storage (ME) capacity kWh-160, min. power of hybrid inverters (kW)-3x30kW(90kW), mounted on the roof of the building; 7) Municipal Kindergarten No. 2 named after Julian Tuwim in Aleksandrów Łódzki, ul. Łęczycka 4 - PV installation kWp-39, min. energy storage (ME) capacity kWh-60, min. power of hybrid inverters (kW)-2x20kW(40kW), mounted on the roof of the building; 8) Municipal Kindergarten No. 3 in Aleksandrów Łódzki, ul. Ściegiennego 5/6 - PV installation kWp-42, min. energy storage (ME) capacity kWh-60, min. power of hybrid inverters (kW)-2x20kW(40kW), mounted on the roof of the building; 9) Primary School No. 1 named after John Paul II in Aleksandrów Łódzki, ul. Waryńskiego 22/26 - PV installation kWp-118, min. energy storage (ME) capacity kWh-160, min. power of hybrid inverters (kW)-4x30kW(120kW), mounted on the roof of the building. 3. The subject of the contract includes in particular: 1) preparation of design documentation, 2) obtaining the necessary opinions, approvals, expertises, agreements and permits as well as making the required by law notifications, 3) supply of photovoltaic panels, hybrid inverters, energy storage systems, energy meters and other devices and elements necessary for the implementation of the subject of the contract, 4) execution of construction and assembly works, 5) commissioning of the installation, 6) providing access to applications serving to monitor the operation of the installation available on phone/computer 7) training users of the installation in the scope of its operation and maintenance, 8) registration of the installation with the local OSD and the State Fire Service, 9) carrying out free technical inspections of the constructed photovoltaic installations during the warranty period, 10) preparation of documentation confirming the achievement of product indicators and result indicators. 4. The detailed material scope and the method of implementing the subject of the order are specified in the Functional-User Program for the project entitled: „Construction of photovoltaic panel installations for public utility buildings in the Municipality of Aleksandrów Łódzki” along with the annexes (constituting Annex No. 7 to SWZ). 5. The subject of the contract is co-financed by the European Union within the regional program Fundusze Europejskie dla Łódzkiego 2021-2027, Action FELD.02.06 Renewable energy sources – ZIT Łódzki Obszar Metropolitalny Priority FELD.02 European funds for green Łódź, Contract No. FELD.02.06-IZ.00-0011/25-00. In this regard, the implementation of the subject of the order is to bring about the indicators of achieving the objectives of the project set out in the subsidy agreement, and consequently the summary product indicators and result indicators described in point II.7 SWZ. 6. The contractor is obliged to implement the subject of the order in a manner that ensures the achievement of the following indicators: 1) product indicators in the form of: a) additional capacity to generate electricity from RES, target value - 0.4900 MW, b) number of constructed units generating electricity from RES, target value - 9 units, c) number of constructed units generating electricity using solar radiation energy, target value - 9 units, d) capacity of electrical energy storage systems, target value – min. 0.79 MWh, e) number of electrical energy storage systems created, target value - 9 units, whereby the achievement of the indicators indicated in point 1) lit. a-e above will be verified on the basis of the Final Acceptance Protocol of the completed works. 2) result indicator in the form of: a) amount of electricity generated from RES, target value to be achieved after 12, 24, 36, 48, 60 months from the final acceptance deadline of the subject of the contract is 440.00 MWh/year, whereby the achievement of the indicator

CPV codes

Solar installationScaffolding erection workEngineering servicesAncillary building servicesElectrical installation workElectricity supply installationsSolar photovoltaic modulesBuilding installation workConstruction work for pipelines, communication and power linesSolar panel roof-covering workElectrical wiring workBuilding completion workArchitectural and related servicesEngineering design servicesElectrical power systems design servicesMechanical and electrical engineering servicesPhotovoltaic cellsSite preparation and clearance workEngineering works and construction worksElectrical fitting workElectrical engineering installation worksLow-voltage installation workEngineering design services for mechanical and electrical installations for buildingsElectric accumulatorsInverters

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders