Ukraina – Raudtee ja trammi reisivagunid ja trollibussid – Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded
Kirjeldus
Linnalülituse trammide tootmine, ühesuunalised, ühe juhtkabi, varustatud kolme telikuga, arvestades lubatud teljelast. 100% reisijaruumi pikkus peab olema madal, vaba ligipääs ilma astmeteta kõigi reisijate uksele peatusplatvormilt. Osade arv: mitte rohkem kui kolm. Trammi peavad olema järgmised välised mõõtmed: pikkus: 26 000 mm kuni 27 000 mm; laius: nimetus 2 500 mm; kõrgus: maksimaalselt 3 500 mm (3 700 mm, kui vooluvõrgu pantograaf on allas); miinimumkurvatuur: 20 meetrit peal (maksimaalne kiirus 10 km/h); miinimumstandardi kurvatuur: 18 meetrit depoos; teljebaas: 1 800 mm – 1 900 mm; kaugus raudtee telje keskpunktist reisijate platvormi servani, mis asub raudtee sirgel: 1 350 mm. Oodatud reisijate koguarv: 250 (± 10%) 8 reisijat/m² (koormus AW3); istmete arv: vähemalt 60 ± 10%; ratastoolide ruumide arv: vähemalt 1.
CPV koodid
Dokumendid & esitamine
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Seotud hanked
Ukraine – Passenger cars – Light specialized vehicles within the framework of the Project “ProAll - Prometheus Alliance - Joint response in case of fires, fires in hard to reach areas and search and rescue interventions” under the Interreg NEXT Romania–Ukraine Programme 2021–2027
The Main Department of the State Emergency Service of Ukraine in Ivano-Frankivsk regionUkrainaPassenger carsSpecialist vehiclesTähtajaks on 45 päevaAvaldatud 09. sept 2026
Ukraine – Low-floor buses – Supply of new low-floor electric buses, including battery charging infrastructure (night charging stations and fast charging stations at final stops), main spare parts, wearing and consumable spare parts, maintenance and repair equipment and tools, and related services up to a total budget of € 9.840 million, sales taxes and customs duties excluded
Zaporizhzhia Municipal Enterprise of City Electric Transport “Zaporizhelektrotrans”UkrainaLow-floor busesTähtajaks on 11 päevaAvaldatud 08. sept 2026
Ukraine – Heavy-duty motor vehicles – Pump-and-hose fire-fighting vehicle
Main Department of the State Emergency Service of Ukraine in Volyn RegionUkrainaHeavy-duty motor vehiclesTähtajaks on 34 päevaAvaldatud 03. sept 2026
Ukraine – Railway and tramway passenger coaches, and trolleybuses – Supply of new Metro trainsets, 5 coaches each, including spare parts and consumables, equipment and tools for maintenance, repair and related services, up to a total budget of euro 45 (forty five) million, sales taxes and customs duties excluded
Communal Enterprise “Kharkivsky metropoliten”UkrainaRailway and tramway passenger coaches, and trolleybusesTähtajaks on 29 päevaAvaldatud 13. aug 2026