Malte – Travaux de construction – Restricted Procedure for the manufacture and laying of 2 x 33 kV Three-Core Submarine Power Cables with embedded FO cable between Malta and Gozo
Enemalta plcMaltePublié le 30 sept. 2026
Aucun délai donnéDescription
L'objectif global de cette demande est de confier à un adjudicataire la fabrication et la pose de deux câbles sous-marins de 33 kV avec fibre optique intégrée entre Malte et Gozo.
Codes CPV
Construction workHigh voltage installation workWorks for complete or part construction and civil engineering work
Documents et soumission
Résumé AI
Connectez-vous pour un résumé AIContains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Marchés similaires
Malta – Footpath construction work – Maintenance and Construction of Resource-Efficient Pavements, Boundary Walls and Other Ancillary Works for the Marsaskala Local Council
Marsaskala Local CouncilMalteFootpath construction workFoundation work for footpathsSurface work for footpathsDélai dans 29 joursPublié le 19 nov. 2026
Malta – Workshops construction work – CT2382/2026 - DESIGN AND BUILD OF A WORKSHOP OVER AN EXISTING UNDERGROUND WATER RESERVOIR
Department of ContractsMalteWorkshops construction workConstruction work for warehouses and industrial buildingsConstruction work for industrial buildingsDélai dans 46 joursPublié le 18 nov. 2026
Malta – Substation construction work – CT3065/2026 - Works - Tender for the Design, Supply, Installation, Testing, and Commissioning of a 245kV, 120MVAr Shunt Reactor, 245KV GIS, and Associated Systems at Maghtab including Civil Works in an Environmentally Friendly Manner
Department of ContractsMalteSubstation construction workHigh voltage installation workLow-voltage installation workDélai dans 45 joursPublié le 18 nov. 2026
Malta – Construction works for sewage treatment plants, purification plants and refuse incineration plants – WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION