Poland – Environmental engineering consultancy services – Opracowanie raportów na potrzeby przeprowadzenia ponownej oceny oddziaływania na środowisko, dla Przedsięwzięcia pn. Budowa i eksploatacja pierwszej w Polsce Elektrowni Jądrowej, o mocy elektrycznej do 3750 MWe, na obszarze gminy Choczewo
Description
The subject of the Contract in the framework of orders based on the framework agreement will be the preparation of Environmental Impact Reassessment Reports for the Investment “Construction and operation of the first nuclear power plant in Poland, with an electrical capacity of up to 3,750 MWe, in the area of the municipality of Choczewo. 2. The detailed description of the subject of the Contract is contained in Annex A to the Draft Contractual Provisions, which constitute Annex No. 1 to the SWZ. 3. The subject Procedure is conducted in the form of an unrestricted tender based on Article 132 in conjunction with Article 378 of the Act of 11 September 2019 - Public Procurement Law (i.e. Journal of Laws of 2026, item 793 with later amendments), (hereinafter: the Pzp Act). 4. The subject Procedure is also subject to the provisions of the Act of 29 June 2011 on the preparation and implementation of investments in the field of nuclear energy facilities and related investments (Chapter 6) (i.e. Journal of Laws of 2025, item 1156 with later amendments), hereinafter referred to as the Investment Act. 5. Whenever in this Notice reference is made to the Specification or SWZ – this means the Specification of Contract Conditions together with the annexes, which are an integral part thereof. 6. The Contracting Authority informs that the public procurement procedure will be conducted using the Contracting Authority's Procurement Platform. 7. The website address of the conducted Procedure: https://pz.pej.pl (under this address, changes and clarifications of the content of the SWZ and other documents of the Contract directly related to the Procedure for the award of the Contract will be made available). 8. In this procedure, communication between the Contracting Authority and Contractors, including the submission of Offers, exchange of information and transmission of documents or declarations, with the exception of those indicated in the PZP Act, is carried out using electronic communication means via the Platform, available at the address: https://pz.pej.pl. 9. A Contractor intending to participate in the procedure for the award of a contract must have an account on the Procurement Platform. Registration and maintenance of an account on the Procurement Platform and use of the Platform is free of charge. 10. The technical and organisational requirements for using the Platform are specified in the Platform Regulations (available at the internet address https://pz.pej.pl/user/terms). A Contractor, by participating in the procedure for the award of a contract, i.e. by registering for free or logging in (in the case of having an account on the Platform), accepts the terms of use of the Platform as specified in the Regulations and acknowledges them as binding. 11. Detailed information on electronic communication means is contained in point 17 of the SWZ. 12. The Contracting Authority, pursuant to Article 139(1) of the PZP Act, provides for a so-called reverse procedure, i.e. first conducts an examination and evaluation of Offers to determine the highest-rated Offers, and then conducts a subjective qualification of Contractors, whose Offers have been highly rated in terms of lack of grounds for exclusion and meeting the conditions for participation in the Procedure. Information in this regard is contained in point 15 of the SWZ. 13. The Contractor, to confirm the lack of grounds for exclusion, is obliged to submit with the Offer: 13.1) Pursuant to Article 393(1)(3) of the PZP Act, in order to demonstrate the lack of grounds for exclusion, as referred to in point 13.3 of the SWZ, the Contractor submits a declaration, the template of which is Annex No. 10 to the SWZ. 13.2) In the event of reliance on the capacities or situation of other entities providing resources, the Contractor, together with its declaration referred to in point 13.1) above, also submits a declaration from the entity providing the resources, confirming the lack of grounds for exclusion. 13.3) In the case of joint bidding for a contract by Contractors, the declaration referred to in point 13.1) above is submitted by each of the Contractors jointly bidding for the Contract. 13.4) In the event that a Contractor plans to entrust part of the contract, constituting more than 10% of the contract value, to be carried out by subcontractors and suppliers, and they are known, the Contracting Authority requires the Contractor to submit a declaration, as referred to in point 13.1) above, in respect of those subcontractors and suppliers. 14. The Contracting Authority, in accordance with Article 139(2) of the PZP Act, in connection with point 2.3 of the SWZ, will require the submission of a JEDZ declaration, exclusively from the Contractor whose Offer is highest rated. Information in this regard is contained in point 15 of the SWZ. 15. Before selecting the most advantageous offers, the Contracting Authority will invite Contractors, whose offers have been highest rated, to submit, within a specified period, not shorter than 10 days, declarations and subjective evidence means current on the date of submission, as referred to in point 15 of the SWZ. 16. Pursuant to Article 42(2) of the Investment Act, the Contracting Authority informs that in the event that, within a specified period, the Contractor does not submit the subjective evidence means required by the Contracting Authority, as referred to in point 15.4 of the SWZ, or does not submit powers of attorney, or submits the evidence means required by the Contracting Authority, as referred to in point 15.4 of the SWZ, containing errors, or submits invalid powers of attorney, the Contracting Authority will call on him to submit the respective subjective evidence means or powers of attorney, within a specified period, no more than three times, unless, despite their submission, the Contractor's Offer is subject to rejection or the Procedure would have to be invalidated. The evidence means submitted at the request of the Contracting Authority should confirm the Contractor's fulfilment of the conditions for participation in the Procedure and the fulfilment by the offered services of the requirements specified by the Contracting Authority, no later than on the day on which the deadline for submitting Offers expired. 17. Information on the subjective evidence means relating to Contractors having their registered office or place of residence outside the territory of the Republic of Poland is contained in points 15.6-15.8 of the SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Engineering design services for the construction of civil engineering works – Opracowanie dokumentacji projektowej dla projektu pn.: „Budowa linii łączącej Bełchatów z linią 131”
PKP Polskie Linie Kolejowe S.A.PolandEngineering design services for the construction of civil engineering worksSupervision of project and documentationDeadline in 9 daysPublished on Oct 22, 2026
Poland – Engineering design services – 07590 - Opracowanie dokumentacji projektowej dla zadania pn. „Rewitalizacja ul. Szczytnickiej we Wrocławiu”
Gmina WrocławPolandEngineering design servicesEngineering design services for the construction of civil engineering worksSupervision of project and documentationDeadline in 36 daysPublished on Oct 22, 2026
Poland – Architectural, construction, engineering and inspection services – PEŁNIENIE FUNKCJI INŻYNIERA KONTRAKTU dla Projektu nr FENX.01.02-IW.01-0010/25 pn. „Adaptacja do zmian klimatu na terenie miasta Elbląg – etap I”
Elbląskie Przedsiębiorstwo Wodociągów i Kanalizacji Spółka z ograniczoną odpowiedzialnościąPolandArchitectural, construction, engineering and inspection servicesEngineering servicesSupervision of building workDeadline in 36 daysPublished on Oct 22, 2026
Poland – Engineering design services – Opracowanie projektu budowlanego i projektów wykonawczych oraz uzyskanie decyzji administracyjnych niezbędnych do wykonania robót budowlanych w ramach realizacji zadania pn. „Budowa ul. Zdziarskiej na odcinku od ul. Ostródzkiej do ul. Płochocińskiej wraz z mostem nad Kanałem Żerańskim – prace przygotowawcze”.
Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy MiastaPolandEngineering design servicesEngineering design services for the construction of civil engineering worksEngineering-design services for traffic installationsDeadline in 12 daysPublished on Oct 22, 2026