Finland – Construction work – Miekkarinteen päiväkoti, tiivistyskorjausten kokonaisurakka, Viitasaari

Viitasaaren kaupunkiFinlandPublished on Sep 17, 2026
27 days left

Description

The target is the Miekkarinteen Daycare Centre, a single-storey, approximately 380 m2 public building constructed in 1982. The building is currently in use as a daycare centre and its operation will continue after the completion of the renovation and sealing works. This involves the renovation of the interior air of a public building in use. The work includes the dismantling of the interior lining and the lower part of the structural frame of the building's exterior wall, the repair of the plinth structure, and other sealing works. At the same time, internal sealing repairs are carried out. The contract includes The tender must include all the construction works for the sealing renovation of Miekkarinteen Daycare Centre in accordance with the tender documents. The exterior wall of the building, which is clad with brick or wood, is dismantled from the interior structures of the wall at the lower part, and the structural repairs and sealing works of the plinth are carried out in accordance with the plans. The brick partition walls are dismantled from the lower floor joint and sealed according to the plans. The upper floor ceiling is dismantled and stored, sealed, and the upper floor steam barrier is installed and the lower ceiling is put back in place. The joints of the building's windows and doors are sealed to the frame. The partition walls are dismantled and the lower floor is sealed also from under the beams. The partition doors are reinstalled in their dismantled place. The internal surface structures are renewed in the area of the sealing repairs. The floor coverings are renewed throughout. Partition walls are dismantled and closed in the extent required by the sealing repair of the wall structure. After the sealing repairs, the wall surfaces are painted throughout. The access of soil contamination to the interior air is prevented by structural changes at the junction of the central building's stairwells, in accordance with the plans. Other content The comprehensive contract includes the duties of a site manager for building technical works in addition to the duties of a site manager for the LVIAS works on the interior side. The comprehensive contract includes the main contractor's obligations and other measures required to complete the building contract. The contractor will remove and store the fixtures necessary for the work during the work period. The client offers the contractor storage space free of charge if desired from Lehtolanasunnot at Lehtotie 9, 44500 Viitasaari. The contractor is obliged to protect the storage spaces before moving the fixtures to the storage.

CPV codes

Construction work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders