Poland – Construction work – Modernizacja energetyczna infrastruktury ochrony zdrowia w województwie Lubuskim (ETAP I), termomodernizacja budynków Wielospecjalistycznego Szpitala Wojewódzkiego w Gorzowie Wlkp. Sp. z o.o.
Description
Energy modernization of the healthcare infrastructure in the Lubuskie Voivodeship (Phase I), thermo-modernization of the buildings of Wielospecjalistyczny Szpital Wojewódzki in Gorzów Wlkp. Sp. z o.o. A detailed description of the subject of the contract is contained in the OPZ documentation (Functional and User Program (PFU) together with the annexes) and the PROJECT CONTRACT - which are annexes to the SWZ. The subject of the contract, the contract includes: 1) art. 100 Pzp: The objective of the Contracting Authority is to improve the comfort, safety and accessibility of the healthcare infrastructure for all users of the facility, particularly patients, medical staff and people with special needs, through the implementation of investments in accordance with the principles of universal design and accessibility, as mentioned above. The contract also aims to limit the inconvenience of the works carried out for the users of the facility and to minimize the risk of exposure of patients and staff to asbestos fibres. Determination of the costs to achieve the indicated effect: included in the scope of the PFU development. The way of taking into account the given social aspect within the given contract: • taking into account the requirements regarding accessibility for disabled persons and design for all users in accordance with art. 100 of the Pzp Act, • applying solutions improving the comfort of patients and hospital staff, • execution and modernization of accessibility elements, including ramps and communication for people with special needs, • carrying out works in a way that minimizes inconvenience for patients and hospital staff, • applying solutions limiting the risk of asbestos fibre emissions and the impact of works on the health and safety of users, • ensuring the continuity of the functioning of the hospital departments during the implementation of the investment, • the requirement to employ by the contractor or subcontractor persons performing construction works on the basis of an employment contract in accordance with the provisions of the Labour Code. 2) art. 96 and art. 101 para. 1 of the PZP Act: The objective of the Contracting Authority is to limit the impact of the investment on the environment by applying solutions that increase the energy efficiency of the buildings, reduce energy and media consumption and minimize the emission of pollutants and energy losses throughout the investment lifecycle. The environmental aspect has been taken into account in the PFU by specifying the requirements regarding: • carrying out the thermo-modernization of buildings, including the insulation of facades and ceilings as well as the replacement of window and door joinery, • the use of insulating materials improving the energy parameters of building partitions, • the use of renewable energy sources, including photovoltaic installations and energy storage, • the application of an energy management system, • the use of solutions for recovering waste heat from medical waste incinerators and technological installations, • the modernization of the heating infrastructure in order to limit heat losses, • the application of solutions limiting the risk of asbestos fibre emissions, • the use of materials and technical solutions with increased durability and reduced operating costs. The innovative effect will be achieved through the application of modern technical, technological and installation solutions enabling the optimization of operating costs, increasing energy efficiency and the automation and monitoring of the technical infrastructure of the facilities. The innovative aspect has been taken into account in the PFU by specifying the requirements regarding: • the application of an energy management system, • the use of waste heat recovery installations, • the application of an automatic boiler cleaning system, • the use of monitoring, control and metering systems, • the application of modern technological installations and building automation, • the application of devices and solutions limiting energy losses and operating costs, the use of solutions improving the energy efficiency of the hospital infrastructure. In the event that the description of the subject of the contract refers to standards, technical assessments, technical specifications and technical reference systems, as mentioned in art. 101 para. 1 point 2 and para. 3 of the PZP Act, the Contracting Authority allows equivalent solutions described, and such a reference is accompanied by the words “equivalent”. The Contracting Authority imposes on the Contractors the obligation to carry out a local inspection of the site of the planned construction works. The submission of an offer must be preceded by a local inspection. The Contracting Authority sets the dates of the local inspection, which will take place on: For package no. 1: 22.06.2026 from 08:00 to 10:00 For package no. 2: 22.06.2026 from 10:00 to 12:00 For package no. 3: 22.06.2026 from 12:00 to 14:00
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction work – Przebudowa ul. Retkińskiej na odcinku od ul. Wyszyńskiego do ul. Krzemienieckiej wraz z modernizacją sieci wodociągowej
Miasto Łódź - Zarząd Dróg i Transportu w imieniu i na rzecz którego działają Łódzkie Inwestycje sp. z o.o.PolandConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workDeadline in 8 daysPublished on Jul 20, 2026
Poland – Overhaul and refurbishment work – Remont budynku mieszkalnego wielorodzinnego przy ul. Henryka Pobożnego 20 we Wrocławiu
Zarząd Zasobu Komunalnego Jednostka Budżetowa Gminy WrocławPolandOverhaul and refurbishment workDeadline in 21 daysPublished on Jul 20, 2026
Poland – Works for complete or part construction and civil engineering work – Wykonanie robót budowlanych w ramach zadania inwestycyjnego pn. Rozbudowa Szkoły Podstawowej nr 236 przy ul. Elekcyjnej 21/23 - nr postępowania 40/ZP/26
Miasto Stołeczne Warszawa Dzielnica WolaPolandWorks for complete or part construction and civil engineering workBuilding installation workDeadline in 22 daysPublished on Jul 20, 2026
Poland – Construction work – ,,Bezpieczny transport w Aglomeracji Opolskiej” w zakresie: ,,Budowa sygnalizacji świetlnej na przejściu dla pieszych na styku ulic Plebiscytowa – Drzymały”
Miejski Zarząd Dróg w OpoluPolandConstruction workEngineering works and construction worksInstallation of road signalsDeadline in 34 daysPublished on Jul 20, 2026