Skip to content
Back to search

Denmark – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Ny bane over Vestfyn - 92900.770 - 25kV Kabelforbindelse

BanedanmarkDenmarkPublished on Jun 17, 2026
10 days left

Description

The contract primarily involves the establishment of 2 x 4 km guideways for 4 x 800mm2 25kV feeder cables and 4 x 800mm2 25kV return cables. The guideways are to be laid as 2 x cable trenches as specified in FD149.671751 between Gelsted substation and Fjelsted (approx. 4.0 km). The establishment of the cable trenches includes excavation work and the installation of controlled under-boring, including laying and splicing of 800mm2 high-voltage cables and laying of 4 x Ø40mm empty pipes for fibre cable. Connection of the 800mm2 cables at both ends will be carried out by another contractor, as will the pulling of fibre cables.

CPV codes

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkHigh-voltage cableCable-laying machineryCableInstallation of cable infrastructureInstallation of cable layingDrilling services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders