Skip to content
Back to search

Poland – Construction works for power plants and heating plants – Budowa kotłów elektrodowych o mocy 300 MWt oraz akumulatora ciepła 52 tys. m3 netto wraz z infrastrukturą pomocniczą w PGE Energia Ciepła S.A. Oddział Wybrzeże w Gdańsku

PGE Energia Ciepła S.A.PolandPublished on Oct 25, 2026
33 days left

Description

Construction of 300 MWt electrod boilers and a 52,000 m3 net heat accumulator along with auxiliary infrastructure at PGE Energia Ciepła S.A. Branch Wybrzeże in Gdańsk

CPV codes

Construction works for power plants and heating plantsIndustrial machineryBoilersWorks for complete or part construction and civil engineering workAssembly of metal structuresHeating, ventilation and air-conditioning installation workArchitectural, construction, engineering and inspection services

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders