Skip to content
Back to search

Poland – Cycle path construction work – „Rowerowe Roztocze. Drogi pieszo – rowerowe w obszarach miejskich” – Miasto Tomaszów Lubelski

Miasto Tomaszów LubelskiPolandPublished on Aug 27, 2026
34 days left

Description

The subject of the investment is the construction of a pedestrian and cycle path in the city of Tomaszów Lubelski, divided into three parts. Part I: Rowerowe Roztocze. Pedestrian and cycle paths in urban areas – City of Tomaszów Lubelski - reconstruction of the existing culvert in the scope of its liquidation and construction of a section of the stormwater collector in the place of the liquidated culvert, along the county road no. 3521L at km 0+560 (ul. 29-go Listopada), - reconstruction/renovation of the section of the county road no. 3521L (ul. 29-go Listopada) at km 0+553.60 – 0+566.00 (road surface and pavements above the culvert), - construction of a section of the stormwater drainage network in the existing open ditch for the discharge of rainwater and meltwater, - construction of a pedestrian and cycle path on the stormwater collector, - tree and bush felling colliding with the investment, - securing existing utility networks (in case of their exposure), - removal of collisions, - demolition of existing fences colliding with the investment, - horizontal and vertical signage. Part II: Rowerowe Roztocze. Pedestrian and cycle paths in urban areas – City of Tomaszów Lubelski - demolition of the existing footbridge and construction of a new footbridge for pedestrians and cyclists, - construction of a pedestrian and cycle path - reconstruction of existing standard descents, - tree and bush felling colliding with the investment, - securing existing utility networks (in case of their exposure), - removal of collisions, - demolition of existing fences colliding with the investment, - horizontal and vertical signage. Part III: Rowerowe Roztocze. Pedestrian and cycle paths in urban areas – City of Tomaszów Lubelski Bus stop shelter „A” – on the plan of a right-angled triangle with dimensions along the axes of the perpendicular pillars 362 cm, height to the eaves 218 cm height to the roof ridge 370 cm built-up area of the shelter 7.88 m2 hardened surface under the shelter 19.36 m2 Bus stop shelter „B” – on the plan of a rectangle with dimensions along the axes of the pillars 218x257cm, height to the eaves 210 cm height to the roof ridge 328 cm built-up area of the shelter 6.49 m2 hardened surface under the shelter 17.10 m2 Bike racks – rectangular with dimensions length 110x height 70cm Waste bins (set of 4 fractions) – rectangular with dimensions length 160x height 75cm and width 40cm Lighting pole – height 5.0m, camera and sensor at height 4.0m The detailed description of the subject of the order – further „SOPZ” is defined in Annex No. 1.1 to SWZ, which consists of documents for Part I, Annex No. 1.2 to SWZ, which consists of documents for Part II, Annex No. 1.3 to SWZ, which consists of documents for Part III and the Contract Project constituting Annex No. 3 to SWZ. The contracting authority allows the submission of tenders for one, two or all parts.

CPV codes

Cycle path construction workFootpath construction workSite preparation workWorks for complete or part construction and civil engineering work

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders