Poland – Construction work – Budowa stacji elektroenergetycznej 220/110 kV Wigry
Description
The subject of the contract is the construction of the 220/110 kV Wigry station as part of the project "Interconnection between Poland and Lithuania (currently known as Harmony Link) along with the connection to the Suwałki Special Economic Zone". The scope of work includes design work and construction and assembly works. Furthermore, the Contracting Authority envisages the possibility of exercising the following options: Option No. 1 (with the possibility of two separate applications) - equipping the reserve field R220 kV, described in section 1.2.1 of Part II SWZ PFU. Option No. 2 (with the possibility of a single application) - equipping the reserve field R110 kV, described in section 1.2.2 of Part II SWZ PFU. Option No. 3 - ensuring by the Contractor the permanent operational and maintenance of the Wigry SE, described in section 1.2.3 of Part II SWZ PFU. Option No. 4 - Supervision Option, described in section 2.8. and 11.26 of Part IV SWZ Contract Template. 2. A detailed description of the subject of the contract is given in Part II SWZ Functional-User Program. 3. Names and codes of the Common Procurement Vocabulary: 45000000 – 7 Building construction work. 4. In all cases where the Contracting Authority describes the subject of the contract by reference to standards, technical assessments, technical specifications and technical reference systems, as mentioned in Article 101(1)(2) and (3) of the Act, the Contracting Authority allows equivalent solutions described, if they allow to obtain features or parameters not worse than those referred to. The above means that the contractor may apply solutions described by the Contracting Authority "or equivalent". 5. In accordance with Article 101(5) of the Act, the Contractor who refers to equivalent solutions described by the Contracting Authority is obliged to prove that the supplies offered by him meet the requirements specified by the Contracting Authority, provided that the Contractor proves in the offer, in particular by means of substantive evidence, as mentioned in Articles 104-107 of the Act, that the proposed solutions meet the requirements specified in the description of the subject of the contract to an equivalent extent. 6. The contract is implemented as part of a project co-financed by the European Union from the Connecting Europe Facility. 7. In accordance with the provisions of Article 438 of the Act in connection with Article 95(1) of the Act, the Contracting Authority specifies the requirements related to the implementation of the contract in the scope of employment by the contractor or subcontractor on the basis of an employment relationship of persons performing the activities indicated by the Contracting Authority in the scope of the implementation of the contract, if the performance of these activities consists in performing work in the manner specified in Article 22(1) of the Act of 26 June 1974 - Labour Code (Dz.U. of 2023 item 1465). The requirements are included in Part II and IV SWZ.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Roadworks – BUDOWA BEZKOLIZYJNEGO SKRZYŻOWANIA DWUPOZIOMOWEGO POMIĘDZY MIEJSCOWOŚCIAMI JUSTYNÓW I JANÓWKA”
Gmina AndrespolPolandRoadworksBuilding demolition and wrecking work and earthmoving workConstruction, foundation and surface works for highways, roadsDeadline in 9 daysPublished on Oct 27, 2026
Poland – Construction work – B/20/2026 Przebudowa budynku Biblioteki Głównej i Instytutu Historii Uniwersytetu Opolskiego.
Uniwersytet OpolskiPolandConstruction workSite preparation workBuilding demolition and wrecking work and earthmoving workDeadline in 12 daysPublished on Oct 27, 2026
Poland – Construction work – Opracowanie dokumentacji projektowej i realizacja robót budowlanych w zakresie podsystemu "Energia" - sieć trakcyjna na linii kolejowej nr 85 odc. Warszawa - Łódź
Centralny Port Komunikacyjny sp. z o.o.PolandConstruction workElectrical installations for railwaysSubstation construction workNo deadline givenPublished on Oct 27, 2026
Poland – Construction work – Budowa dwutorowej linii Gdańsk Błonia – Olsztyn Mątki.
Polskie Sieci Elektroenergetyczne Spółka AkcyjnaPolandConstruction workDeadline in 41 daysPublished on Oct 27, 2026