Skip to content
Back to search

Poland – Construction work – Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich - budowa dróg pieszo-rowerowych i MOR-u w gminach Modliborzyce i Chrzanów

Powiat JanowskiPolandPublished on Nov 05, 2026
11 days left

Description

The subject of the order are construction works consisting of the implementation of the order entitled “Cycling Roztocze. Pedestrian and cycle paths in rural areas – construction of pedestrian and cycle paths and a Bike Service Facility (BSF) in the municipalities of Modliborzyce and Chrzanów” divided into three parts. The order includes the execution of construction works related to the construction of pedestrian and cycle paths in the municipalities of Modliborzyce and Chrzanów, as well as the construction of a Bike Service Facility (BSF) in the municipality of Chrzanów. Part No. 1 – Expansion of county roads no. 2804L Modliborzyce – Błażek and no. 2812L Wolica Pierwsza – Branew in the scope of building a pedestrian and cycle path Modliborzyce – Krzywe Drogi. Description of the investment: The task entitled “Expansion of county roads no. 2804L Modliborzyce – Błażek and no. 2812L Wolica I - Branew in the scope of building a pedestrian and cycle path (Modliborzyce – Krzywe Drogi)” covers the section of the county road no. 2804L from the intersection with the municipal road no. 108739L ul. Zamkowa to the intersection with the county road no. 2812L (on the right side of the roadway) and the section of the county road no. 2812L from its beginning to the height of the plot no. 453/2 Wolica Pierwsza (on the left side of the roadway). The length of the planned construction of the pedestrian and cycle path is 4,092 m. The task includes the construction of a pedestrian and cycle path with an asphalt concrete surface. The target width of the pedestrian and cycle path will be 3.00 m. As part of the task, due to the need to remove the uncovered ditch, the construction of a storm sewer is planned. The undertaking provides for the removal of collisions with telecommunication and power infrastructure, the removal of trees colliding with the investment and planting new ones in non-colliding places. The investment is located in the Lubelskie Voivodeship, Janowski County, Modliborzyce Municipality, Kolonia Zamek, Wolica Kolonia, Wolica Pierwsza. Part No. 2 – Expansion of the county road no. 2810L Krzemień – Chrzanów – Goraj in the scope of building a pedestrian and cycle path (Chrzanów II – Chrzanów I). Description of the investment: The task entitled “Expansion of the county road no. 2810L Krzemień – Chrzanów – Goraj in the scope of building a pedestrian and cycle path (Chrzanów II – Chrzanów I)” covers the section of the county road no. 2810L from the roundabout (intersection with the county road no. 2809L Chrzanów – Otrocz) in m. Chrzanów Drugi to the intersection with the municipal road no. 108807L in m. Chrzanów Pierwszy with a length of 3,644 m. The task includes the construction of a pedestrian and cycle path with an asphalt concrete surface and for approx. 113 m with concrete paving blocks without phase. The target width of the pedestrian and cycle path will be 2.50 - 3.00 m. The width of the sidewalk is 0.50 m. As part of the task, due to the collision, the street lighting will be rebuilt. The project also provides for the removal of collisions with power and telecommunication networks, as well as the reconstruction of culverts under the road crown. The investment is located in the Lubelskie Voivodeship, Janowski County, Chrzanów Municipality, Chrzanów Pierwszy, Chrzanów Drugi. Part No. 3 – Construction of a Bike Service Facility in the locality of Chrzanów. Description of the investment: The task entitled “Construction of a Bike Service Facility in the locality of Chrzanów” includes the implementation of: 1) one shelter “A”, this is a technical shelter with devices for repairing and charging bicycles (repair station in the middle and charging sockets at the internal walls of the shelter according to the drawings). This shelter will also serve for the regeneration and stop of tourists on bicycles. The shelter contains a bench and a table for a minimum of 3 people. A MOR information board and a map of routes are located on it, 2) three shelters “B”, these are shelters for the regeneration and stop of tourists on bicycles. The shelters contain a bench and a table for a minimum of 6 people, 3) eight bicycle stands, in which two bicycles can be parked at one, 4) one set of bins for selective waste collection, 5) three monitoring cameras with a sensor installed on existing lighting poles, 6) a main power distribution and cable-measuring junction. The detailed scope of work to be carried out is specified in the project documentation attached to the SWZ. NOTE: The contractor may submit an offer for one or more parts of the order.

CPV codes

Construction workCycle path construction workFootpath construction workSite preparation and clearance workRoad-surface painting workInstallation of road signsSite preparation workSiteworksRoof-covering workRoof-framing workVarious surface worksElectrical installation workLandscaping workPrefabricated unitsRoad markings

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders