Poland – Various surface works – Wykonanie infrastruktury rowerowej w ramach zadania inwestycyjnego pn. „Promowanie zielonej mobilności na terenie Gminy Dąbrowa Górnicza - etap V.
Description
The subject matter of the contract concerns the construction of pedestrian and cycle paths in Dąbrowa Górnicza for the following tasks:
Task 1. ul. Kosmonautów - from ul. Kasprzaka to ul. 1000-lecia along the pavement located on the right side of the carriageway looking towards ul. 1000-lecia,
Task 2. ul. Legionów Polskich - on the southern side of the carriageway from the roundabout at Kaufland to the intersection with ul. Jaworowa/Struga,
Task 3. ul. Robotnicza - from the intersection with ul. Korzeniec on the eastern side of the carriageway to Park Zielona,
Task 4. ul. Korczaka - from ul. Królowej Jadwigi through the plant to ul. Wojska Polskiego,
Task 5. ul. Piłsudskiego - from the intersection with ul. Kasprzaka-Zaplecze to the intersection with ul. Tworzeń on the southern side next to the tram tracks,
Task 6. ul. Sobieskiego - from the intersection with ul. Kolejowa (Powiatowy Urząd Pracy roundabout) to the border with the city of Będzin on the northern carriageway,
Task 7. ul. Struga - on the western side of the carriageway from the intersection with ul. Dąbrowskiego to the intersection with ul. Legionów Polskich,
Task 8. ul. Tysiąclecia - at the existing pavement on the western side of ul. Tysiąclecia from the intersection with ul. 11 Listopada to the intersection with ul. Podlesie,
Task 9. ul. Podlesie - at the existing pavement on the southern side of ul. Podlesie from the intersection with ul. Tysiąclecia to the intersection with ul. Myśliwska,
Task 10. ul. Wojska Polskiego - on the northern side of the carriageway, from the area of the intersection with ul. Korczaka to the intersection with ul. Królowej Jadwigi,
Task 11. ul. Inwestycyjna - from the intersection of ul. Roździeńskiego with ul. Ząbkowicka to ul. Ceramiczna on the "Tucznawa" investment areas.
2. The scope of work for the subject matter has been defined in the project documentation, the scope of work, and SWZ, and includes, among others:
a) Demolitions;
b) Surveying and geodetic works – pedestrian path / pedestrian road / pedestrian and cycle path in the area;
c) Mechanical earthworks;
d) Manual earthworks;
e) Execution of separating layers from sand;
f) Execution of subbase layers from crushed aggregate;
g) Laying of a binding layer;
h) Laying of a wearing layer;
i) Laying of the surface (pavement) with concrete paving blocks 8 cm thick, on a cement-sand base;
j) Concrete edging 30x8 cm mounted on a concrete bench with a concrete C12/15 support;
k) Laying of a road curb on a concrete bench;
l) Restorations;
m) Execution of vertical and horizontal signage and BRD facilities - Horizontal signage
n) Thin-layer and thick-layer bituminous surfacing;
o) Finishing works,
p) works in the scope of green areas,
q) change of the target traffic organization.
The detailed scope of work to be carried out has been described using: the scope of work, STWiOR and project documentation for eleven locations; constituting Annex No. 10 to the specification of contract conditions.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Wastewater treatment plant construction work – Budowa centrum produkcji zielonej energii z wykorzystaniem gospodarki obiegu zamkniętego
Regionalne Centrum Gospodarki Wodno-Ściekowej S.A.PolandWastewater treatment plant construction workPlant engineering design servicesArchitectural design servicesDeadline in 43 daysPublished on Sep 20, 2026
Poland – Construction work – Budowa połączenia komunikacyjnego strefy przemysłowej we Władysławowie
Gmina WładysławowoPolandConstruction workDeadline in 63 daysPublished on Sep 20, 2026
Poland – Cycle path construction work – Rozbudowa dróg powiatowych w ramach projektu „Rowerowe Roztocze. Drogi pieszo-rowerowe w obszarach wiejskich” na terenie powiatu biłgorajskiego
Powiat BiłgorajskiPolandCycle path construction workFootpath construction workSite preparation workDeadline in 35 daysPublished on Sep 20, 2026
Poland – Works for complete or part construction and civil engineering work – Budowa przepompowni ścieków przy ul. Kobryńskiej wraz z dwoma przewodami tłocznymi oraz budowa kanalizacji sanitarnej w ul. Leśniczówki i Kobryńskiej, na terenie Dzielnicy Wawer w Warszawie
Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w m. st. Warszawie S.A.PolandWorks for complete or part construction and civil engineering workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkConstruction work for pipelines, communication and power linesDeadline in 14 daysPublished on Sep 20, 2026