Skip to content
Back to search

Poland – Stadium construction work – Modernizacja i rozbudowa infrastruktury sportowej stadionu miejskiego w Grodzisku Mazowieckim

Gmina Grodzisk MazowieckiPolandPublished on Jul 26, 2026
11 days left

Description

The subject of the contract is the Modernisation and expansion of the sports infrastructure of the municipal stadium in Grodzisk Mazowiecki. As part of the subject of the contract, the following main construction works will be carried out: 1/ Demolition of the existing and construction of a new covered stand, including, inter alia: -demolition of the existing stand, -execution of the reinforced concrete structure of the stand, -installation of seats and barriers on the stand, -execution of the steel structure and roof covering, -construction of connections: sanitary and rainwater sewerage, water supply, -equipment of rooms, including, inter alia, furniture, computers 2/ Construction of sports infrastructure, including, inter alia: -execution of internal and external finishing works, -installation of sanitary installations and equipment, including, inter alia: water supply, central heating with heat pumps, mechanical ventilation, rainwater sewerage with a retention tank, hydrant installation, air conditioning, -installation of electrical and telecommunication installations and equipment, including, inter alia: photovoltaic panels with energy storage, -construction of the ticket office and storage building, -execution of road works, -execution of technical infrastructure, -land development, including, inter alia: fencing, greenery Main parameters of the subject of the contract: A/ Stand: -floor area: 1 548.14 m2 -usable area: 1 466.81 m2 -volume: 9 198 m3 -number of storeys: variable from 1 to -number of seats on the stand: 2 014 B/ Ticket office and storage building: -floor area: 40.77 m2 -usable area: 28.53 m2 -volume: 122 m3 -number of storeys: 1 The subject of the contract also includes making agreements, obtaining all opinions and decisions as well as carrying out all necessary works enabling the use of the facility, including obtaining by the Contractor on behalf of the Contracting Authority a permit for the use of the facility. The detailed scope of works covered by the contract is specified in the project documentation.

CPV codes

Stadium construction workConstruction workSite preparation and clearance workConstruction work for sports facilitiesStructural steel erection work for structuresSeatsChairs

Documents & submission

AI summary
Sign in for an AI summary

Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.

Related tenders