Romania – Construction work for school buildings – Servicii de proiectare, asistență tehnică și lucrări de execuție privind obiectivul de investiții: CONSTRUIREA COMPLEXULUI EDUCAȚIONAL MULTIFUNCȚIONAL ÎN CARTIERUL HENRI COANDĂ, BD. IULIAN MIHU F.N.
Description
The subject of the contract is the design, technical assistance, and construction of a multifunctional educational complex in the Henri Coanda district, consisting of buildings for educational purposes with the following layout:
Building A – gymnasium – Sc = 1 770 m², Sd above ground = 5 825 m², height regime D+P+3E
Building B – kindergarten – Sc = 1 400 m², Sd = 4 085 m², height regime P+1E+2Er
Building C – sports hall and swimming pool – Sc = 1 265 m², Sd = 4 435 m² (including technical basement) height regime S+D+P+M+1E
GREEN PLANTED SPACES AT GROUND LEVEL WITH VEGETATION LAYER – 7 695.00 m² equivalent to approx. 45.80% of the land area
MULTI-SPORT FIELD AND PLAY AREA – 2 917.00 m²
ALLEYS + PLATFORMS – 1 750.00 m²
The multifunctional educational complex to be developed is proposed to be located in the western zone of the Henri Coanda district. The building-free land plot, with an area of 16 797 m², is intra-village and is owned by the Municipality of Bucharest and administered by the Local Council of Sector 1 Bucharest, having the use category: yards-constructions.
The contract duration of min. 80 months is composed of:
Design duration: maximum 8 months from the date of the design commencement order.
Execution duration of works: maximum 36 months from the date of the execution commencement order.
Warranty period granted to works: minimum 36 months from the date of acceptance upon completion of works, in accordance with the contractual provisions.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Romania – Water-treatment work – Servicii de proiectare, asistenta tehnica din partea proiectantului și executie lucrari pentru contractul CL 14
ECOAQUA SARomaniaWater-treatment workWorks related to water-distribution pipelinesWater-main refurbishment construction workDeadline in 45 daysPublished on Sep 20, 2026
Romania – Construction work – Achiziționarea execuției lucrărilor pentru realizarea obiectivului „Lucrări de reabilitare la depozitul de carburanți lubrifianți in cazarma 962 Bascov” cod proiect 2020 –C/I – 962 Bascov
MINISTERUL APARARII - U.M. 02517 CRAIOVARomaniaConstruction workNo deadline givenPublished on Sep 20, 2026
Romania – Gas supply mains construction work – Servicii de proiectare, asistenta tehnica din partea proiectantului si executie lucrari in vederea realizarii proiectului „Infiintare retea distributie gaze naturale in comunele Scheia si Mironeasa din judetul Iasi”
ASOCIATIA DE DEZVOLTARE INTERCOMUNITARA PENTRU DEZVOLTAREA RETELELOR DE GAZE NATURALE IN COMUNELE SCHEIA SI MIRONEASARomaniaGas supply mains construction workGas distribution ancillary workPipeline-design servicesDeadline in 18 daysPublished on Sep 20, 2026
Romania – Pipeline lifting and relaying – Achiziția execuției lucrărilor, inclusiv a serviciului de proiectare (PAC, PT, DDE, asistență tehnică) pentru obiectivul de investiții "Reabilitarea reţelelor de termoficare primare şi secundare din municipiul Constanţa – etapa V"
MUNICIPIUL CONSTANTARomaniaPipeline lifting and relayingHeating pipesDistrict-heating mains construction workDeadline in 35 daysPublished on Sep 20, 2026