Poland – Site preparation work – Rozbudowa i przebudowa budynku „TARNOWSKIE TERMY” budowa zjeżdżalni, wodnego placu zabaw i murów oporowych wraz z niezbędną infrastruktura techniczną.
Description
1. The Contracting Authority informs that it has a building permit in accordance with decision no. 2251/26 of 17.07.2026 issued by the Starost of Poznan. 2. The Contracting Authority informs that the investment area is subject to archaeological surveys in accordance with the decision of the archaeological research permit no. 190/C/2026. 3. Special conditions for securing the construction site and carrying out construction works: the construction works should be carried out in accordance with the technical conditions and occupational health and safety (OHS) rules applicable in construction, as well as the agreements to the project, and the construction site should be secured against access by unauthorised persons. 4. The Contracting Authority informs that the task of the expansion and reconstruction of the building "TARNOWSKIE TERMY", the construction of the slide, water playground and retaining walls along with the necessary technical infrastructure will take place at the currently operating Aquapark Tarnowskie Termy facility with possible temporary inclusions of zones. 5. The Contractor must schedule the work so that it does not hinder the main activity of the facility. 6. The Contractor is obliged to allocate and secure works/activities that enable the operation of the facility. 7. At the same time, the Contracting Authority indicates that work on the expansion of the sauna zone may only begin in September 2027. 8. The Contracting Authority waives the execution of the electrolyser (the Contracting Authority has already carried out the exchange). 9. The arrangement of the interior of the new sauna on the side of the Contracting Authority, after the work is completed by the Contractor, the Contracting Authority will carry out inside the sauna (layout of benches, stove and lighting and sound, ventilation). 10. Replacement of the CCTV recorder on the server - described in annex no. 1 – list of items – parameters. 11. The Contracting Authority informs that the newly created lockers along with the infrastructure must be compatible with the existing ESOK system. 12. The Contracting Authority does not order the execution of the path of approx. 45m2 (marked in red on the map [MT1.1][MK1.2]). 13. The Contracting Authority informs about the existing systems in the facility: - Fire alarm – BOSCH - Access control – Roger - ESOK – LSI Software (in 2027 the Contracting Authority plans to change the ESOK system) Equipment: Ventilation units – Menerga.
CPV codes
Documents & submission
Contains data from Tenders Electronic Daily (TED), © European Union, ted.europa.eu — CC BY 4.0.
Related tenders
Poland – Construction, foundation and surface works for highways, roads – ,,Budowa nowego przebiegu drogi wojewódzkiej nr 721 na odcinku od drogi krajowej nr 7 do skrzyżowania z ulicą Mleczarską w Piasecznie, odcinek II - od węzła drogowego S7 do skrzyżowania z ulicą Mleczarską w Piasecznie” – nr postępowania 194/26
Mazowiecki Zarząd Dróg Wojewódzkich w WarszawiePolandConstruction, foundation and surface works for highways, roadsSite preparation workConstruction work for pipelines, communication and power linesDeadline in 33 daysPublished on Nov 05, 2026
Poland – Construction work – AFiR Stacja Paliw BP Kołbaskowo (A6), w tym budowa stacji 110/15 kV Kołbaskowo
ENEA Operator sp. z o.o.PolandConstruction workElectrical machinery, apparatus, equipment and consumables; lightingElectric motors, generators and transformersDeadline in 11 daysPublished on Nov 05, 2026
Poland – Cycle path construction work – Zaprojektowanie i budowa drogi dla pieszych i rowerów przy drodze gminnej
Gmina ZakroczymPolandCycle path construction workBuilding demolition and wrecking work and earthmoving workFoundation work for streetsDeadline in 9 daysPublished on Nov 05, 2026
Poland – Construction work – Roboty budowlane i prace konserwatorskie w ramach projektu „Kompleksowe prace budowlano-konserwatorskie w Zamku w Kwidzynie wraz z adaptacją do celów wystawienniczych lokali usytuowanych w sąsiedniej nowej zabudowie” nr FENX.07.01-IP.04-0045/25 dofinansowanego ze środków Programu FEnIKS oraz budżetu państwa – część nr 1
Muzeum Zamkowe w MalborkuPolandConstruction workElectrical installation workElectrical engineering installation worksDeadline in 33 daysPublished on Nov 05, 2026